The project consisted of the construction of an Ophthalmology Unit extension at Nenagh General Hospital, Nenagh, Co. Tipperary.
The works were commissioned at short notice at the beginning of March 2020 as part of the Health Service Executive’s Covid 19 emergency planning and were constructed under Covid-19 Crisis Works Building Control Regulations 2020 (STATUTORY INSTRUMENTS. S.I. No. 112 of 2020 and S.I. No. 113 of 2020).
Fortress Planning were part of the Design Team fulfilling roles of Assigned Certifier and PSDP.
The design Team consisted of the following:
Ready Architecture & Urbanisation – Architect
Clancy Construction – Main Contractor
Marson Cunsulting Engineers – Mechanical & Electrical Consultant
Horgan Lynch Partners – Engineering Consultant
Fortress Planning – Assigned Certifier and PSDP
MJP Consultants – Fire Design
GSP fire Ltd. – Fire Engineer