Demolition of existing prefabricated structure which houses Pre-School
Demolition of existing bicycle shed
Waste Management and Disposal of all demolition material
Construction of new rear extension where previous prefabricated preschool and bicycle shed stand containing new mainstream classroom, 2 x learning support rooms (Open plan), circulation/connecting corridor and new unisex wheelchair accessible disabled wc
Slight construction modifications to existing WC and open to new learning support room
Construction of new disability access ramps and steps
Re-routing of overhead power lines underground to new ESB meter in the front of the school.
Civil / Drainage / Ground Works o New foul water drainage system (related to new extension(s)) to be laid and connected to new wastewater treatment packaged system.
New wastewater treatment packaged system and new percolation area.
New surface water drainage system (related to new extension(s)) to be laid and connected to existing soakaway to rear of the existing school
Provisions to be constructed for future Portacabin for Pre-School to the south west of the national school and future new wastewater treatment system packaged unit
All associated civil works including drainage, surface water and foul water works
Footpath, tarmacadam surfacing and remedial works
The design Team consisted of the following :
• Fortress Planning – Main Consultant
• Bernard Smith Consulting Engineers – Mechanical & Electrical Consultant
• GEO Environmental – Environmental Engineers
• Fortress Planning – Design Certifier / Assigned Certifier
• Fortress Planning – Fire Design
• Fortress Planning PSDP